2/20/2024 0 Comments 2 sigma control chartIt is necessary to investigate what the causes ![]() Yes, point 10 (batch no 12) has out-of-control results. H) Do you think that the data point indicated as violating a Nelson rule should be seen as out-of. Test Failed at points: 10 (this was batch number 12 WPE =498 /499 / 509 Are there any rules violated?Ģ out of 3 points more/less than 2 standard deviations from center line/2 out of 3 points in Repeat this procedure until all data points are inside the control limits.Į) What are the final control limits which can be accepted and used for the process monitoring inįor sample mean (Xbar-chart): LCL=447,50 & UCL=508, 17įor sample range (R chart): LCL=0 & UCL=76,į) Apply all Nelson rules by selecting the tab “Tests” in XBar-RChart Options to find out if thereĪre any strange patters in the control charts as defined in (d). 4 out of 5 points more/less than 1 standard deviation fromĬenter line, in Zone B or beyond (on one side of CL).ĭ) If the process is out of control eliminate the data points that lie beyond the control limits. Process shift: TEST 1 (Nelson rule 1, points outside the control limits): One point more/less thanģ,00 standard deviations from center line In this case some Nelson rules are violated: Outside the control limits is very small (~0%). ![]() The UCLĪnd LCL are defined in such a way that for a process being in control the chance for a point to fall The variation shown by the control chart represents the common variation in the process. This means that there is no evidence that special variation is present X-bar chart monitors between-sample variability (variability in the process over time) and the RĬhart measures within-sample variability (the instantaneous process variability at a givenĬ) Does the advancement process appear to be in control?Ī process is in control, if the plotted values stay within the control limits and do not show any otherĪbnormal trends or patterns. Process (Use Stat-> Control Charts)ī) Which control charts does monitor between-sample variability and which one within-sample Work with X-bar and R control chart to monitor the process. In this assignment you will learn how to use Minitab software to evaluate an industrial process byĪ) Table 1 shows the WPE-number measured in each mixer. Assignment 3: ANSWER Six Sigma Measure Step: Control Charts
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |